CUP for Craft (Micro) Brewery

Planned submittal of Conditional Use Permit (CUP) to use existing facility as a micro brewery.

Location is 10 Buffalo Court in Divide, CO.  See attached letter, below, for details.

Initial meeting between CUP applicant and Divide Planning Committee is scheduled for 19 Feb 2015 at the County Public Works facility starting at 7 PM.  Meeting location information is available at this link.

Meeting minutes for the 19 Feb 2015 DPC meeting are in the Attachments, below.  Everyone agrees the CUP should be supported by the DPC.  Additional signatures are needed for the letter to PK Enterprises for inclusion in the CUP application.  The DPC signed letter is available in the attachments.

Teller County Planning Commission hearing on this topic is scheduled for June 9, 2015 at 7 PM in the Woodland Park City Council Chambers.  At that meeting the request for CUP was approved with reasonable conditions.

Attachments:
FileDescriptionFile sizeLast modified
Download this file (DPC Letter with Attachments_ Craft (Micro) Brewery.pdf)DPC Letter with Attachments_ Craft (Micro) Brewery.pdfLetter to DPC1375 kB2015-08-13 11:42
Download this file (Signed DPC Letter to PKE.pdf)Signed DPC Letter to PKE.pdfLetter from DPC to PKE229 kB2015-08-13 11:42
Download this file (2015-02-19 DPC Minutes.pdf)2015-02-19 DPC Minutes.pdfMinutes of DPC Meeting 19 Fed 201555 kB2015-08-13 11:41